Wednesday, August 20, 2008
      
Results

  HUMANITARIAN DEMINING RESULTS 

COUNTRY

STATUS

DESCRIPTION

   

TOTAL

 

Colombia

Ongoing

Area Cleared (M2)  727.95
    Mines/UXO  0
    Metallic Waste  363

Costa Rica

Concluded

Area Cleared (M2)  131,906.85
    Mines/UXO  341
    Metallic Waste  4,761

Ecuador

Ongoing

Area Cleared (M2)  49,848.94
    Mines/UXO  159
    Metallic Waste  13,070

Guatemala

Concluded

Area Cleared (M2)  11,167.14
    Mines/UXO  518
    Metallic Waste  2,402

Honduras

Concluded

Area Cleared (M2)  450,256.50
    Mines/UXO  2,280
    Metallic Waste  57,967

Nicaragua

Ongoing

Area Cleared (M2)  2,693,049.18
    Mines/UXO  63,721
    Metallic Waste  624,537

Peru

Ongoing

Area Cleared (M2)  24,151.11
    Mines/UXO  21
    Metallic Waste  915

Suriname

Concluded

Area Cleared (M2) 2,613.00
    Mines/UXO 12
    Metallic Waste 2,448

 

TOTAL

Area Cleared

Mines/UXO

Metallic Waste

 3,363,720.67

 67,052

 706,463

 

Copyright 2007 by OAS